- Layout of trial sections
- Decide methods mix between Vibro Compaction and Stone Columns as a function of locally encountered soils
- Liquefaction and slope stability calculations
- Supervision of Quality Control measures.
Method Applied:
Over 250,000 m2 area treated with Top Feed Vibro Replacement Stone Columns and Vibro Compaction to a maximum depth of 19 m.